← belizelaw.ai · Mines And Minerals (Safety, Health And Environmental) Regulations, Cap. 226s04 · PART IX — Dumps (Tips), Dams and Lagoons
Engineer’s inspection and report on closure
Mines And Minerals (Safety, Health And Environmental) Regulations, reg. 89 · Revised Edition 2020
Prior to the abandonment or closure of any impoundment,
dam, or waste dump, the long term structural stability and runoff control shall be demonstrated by an engineering report acceptable to the Inspector.
Have a question about this section? Ask belizelaw.ai →